How To Replace The RO Reverse Osmosis Membrane in Water Treatment System

Views: 0     Author: Site Editor     Publish Time: 2025-01-10      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
How To Replace The RO Reverse Osmosis Membrane in Water Treatment System

Part I: Preparation

1.1 Prepare all tools that may be used during the construction process;

1.2 Clean the upstream water inlet pipeline;

1.3 Carefully evaluate the quality of the incoming water;

1.4 Check whether the pipeline has leaks;

1.5 Prepare water-soluble lubricant (chemically pure glycerin);

1.6 Ensure that all parts and chemicals used are complete;

1.7 Check the operation of the pre-treatment system and the normal water output.

图片1

Part II: Dismantling of old reverse osmosis membrane and installation of new membrane

·  Dismantle the pressure vessel and store parts systematically.

·  Remove the old membrane and rinse the pressure vessel.

·  Check the brine seal ring on the new membrane for correct orientation.

·  Insert the new membrane element into the pressure vessel and apply lubricant to the "O" ring of the connecting pipe.

·  Repeat for additional membrane elements until all are installed.

·  Install the thrust ring and check the "O" ring on the element adapter.

·  Align and install the end plate clamping ring and adjust the gap with an adjustment sheet.

·  Repeat for all pressure vessels and connect external pipelines.

Part III: Equipment Debugging

图片2

1. Prepare for debugging: calibrate instruments, set sampling points, check connections, and test rotating equipment.

2. Open discharge valves and adjust the high-pressure pump outlet valve.

3. Use low-pressure pre-treated water to eliminate air from the system and check for leaks.

4. Perform low-pressure flushing for at least 6 hours or follow a soaking procedure.

5. Confirm all valves are correctly set and start the high-pressure pump with controlled flow.

6. Gradually open the high-pressure pump outlet valve and adjust recovery rates.

7. Check chemical dosages and measure inlet water pH.

8. After 1 hour of operation, record parameters and transition to automatic mode.

9. After 24-48 hours, review system performance data and confirm normal operation to complete construction.


NAVAN​​​​​​​ MACHINE

NAVAN Industrial has invested its best resources in technical research, to design and realize innovative in bottle blowing, filling, capping , labeling and packing systems which enable to respond and reach different demands and achieve new goals everyday, seizing the market's expectations in the pass years.

FOLLOW US

  info@navan-machine.com
  +86 15601563990
  +86-512-58621580
   Contact Us
Copyright © 2023 ZHANGJIAGANG NAVAN INDUSTRIAL CO.,LTD